Each year, we set out a Planned Maintenance Programme to address identified issues that impact the visitor experience and the safe operation of the Museum.
In the first quarter of 2018, the following planned maintenance tasks have been completed:
| Location | Description | Completed |
| Bottle & Glass | Replacement of first floor windows | Feb-18 |
| Bottle & Glass | Bracket to attach gas cylinders | Mar-18 |
| Bottle & Glass | Re-grout cellar floor and seal (floor to wet to seal) | Jan-18 |
| Bottle & Glass | Replace rotten door frame to ladies toilet | Mar-18 |
| Hut 14 | Completion of contracted works (full works to be complete June 2018) | Feb-18 |
| Locksmiths | Re-fit lead flashing above front door | Mar-18 |
| Locksmiths | Re-fix fire in kitchen | Mar-18 |
| Morralls | Plaster under side of stairs in store | Feb-18 |
| Morralls | Install floor to under stairs store | Jan-18 |
| Rolfe Street | Paint Entrance Corridor | Jan-18 |
| Site | Install dog facility areas (temporary) | Mar-18 |
| Site Roads | Tarmac repairs/replacement – Tram Crossing | Jan-18 |
| Site Roads | Pothole repairs | Feb-18 |
The full Planned Maintenance Schedule for 2018 can be found within the Museum Documents section of the intranet.