Canalside Toilets – Update

Written by

in

Hi all,

The toilets in Canalside have recently been closed off as the sewage pump is broken.

An engineer examined the toilets on the 12th July and found that it had been jammed up with wipes and sanitary products that have been flushed down the toilets despite notices (and reminders from Maintenance) instructing people to use the bins provided. This pump takes waste only from the Canalside offices and was replaced in September 2021 at a cost of £2100.

Please note that the previous pump lasted for 13 years. The pump will be replaced as soon as possible, and all wipes have now been removed from the toilets.

Please do not flush anything other than toilet paper down the toilets.

Thank you.

Comments

Leave a Reply

Your email address will not be published. Required fields are marked *